Spektrum RC 2.9g Long Lead Linear Servo. This is a replacement servo intended for the E-flite UMX Timber X. Package includes one 2.9g long lead linear servo.
This product was added to our catalog on August 22, 2022
E-flite UMX Timber X
Reviews
There are no reviews yet.
Be the first to review “Spektrum RC 2.9g Long Lead Linear Servo” Cancel reply
Reviews
There are no reviews yet.